Out With the Old, In With the New—In Three Days

tom_d

In 1999, NovaTech installed D/3® Version 9 at AbbVie’s North Chicago facility. Although the system was still running seventeen years later, it became increasingly difficult to maintain. The system was running on a VMS platform, which Corporate IT no longer wanted to support. With the backing from IT, engineering, and operations, AbbVie was ready to upgrade their NovaTech D/3 System in 2016.

Read Full Article